Ongoing

Upgradation & Blacktopping of Khorlochu HPL Permanent Colony Roads at Doksum, Trashiyangtse

Trashiyangtse

Sustainable business park expansion with cutting-edge green technology

Client

Khorlochu HPL

Budget

70

Project Overview

The project involves upgrading and blacktopping roads within the Khorlochu HPL Permanent Colony at Doksum, Trashiyangtse to improve accessibility, safety, and durability. The works include site preparation, pavement construction, drainage installation, and coordination with utilities. Upon completion, the upgraded roads will enhance mobility, reduce travel time, improve safety, and support residential infrastructure development while adhering to environmental and safety standards.

The Challenge

The upgradation and blacktopping of Khorlochu HPL Permanent Colony Roads face challenges such as uneven terrain, weak subgrade, and sections requiring leveling and stabilization. Adverse weather, particularly heavy rainfall, can delay construction and affect pavement quality. Limited access to construction materials, logistics constraints, and coordination with existing utilities may impact timelines. Ensuring traffic management within the colony, worker safety, and minimizing environmental impacts are also key challenges.

Our Solution

Challenges can be mitigated through thorough site preparation, soil stabilization, and proper leveling before paving. Scheduling construction during favorable weather, timely procurement of quality materials, and efficient logistics will maintain progress. Traffic and utility management, along with environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision, monitoring, and quality control will ensure timely and durable completion of the roads.

Key Features

Provides a smooth, safe, and long-lasting road surface.

Prevents waterlogging and protects the pavement.

Ensures minimal disruption to residents during construction.

Implements dust, noise, and erosion control measures.

Related Projects

Black Topping Works of Chazam – Yangneer GC Road

Completed

Black topping of Kunecholing – Buyang road

Completed

Surfacing of Road – Khothakpa-Tshobaley between 61.546 km to 76.500

Completed

Back to All Projects