Completed

Surfacing of Road – Khothakpa-Tshobaley between 61.546 km to 76.500

Khothakpa-Tshobaley

Client

RCC/19 BRTF of Project Dantak. East Bhutan

Completed

2023

Budget

53.34 M

Project Overview

The Khothakpa-Tshobaley road surfacing project aims to improve a 14.954 km stretch by providing a durable and smooth pavement for safer and faster travel. The work includes earthworks, pavement surfacing, drainage installation, and utility coordination, ensuring minimal disruption to road users. This project will enhance connectivity, support local transportation needs, and contribute to regional development while adhering to environmental and safety standards.

The Challenge

The surfacing of the Khothakpa-Tshobaley road between 61.546 km and 76.500 km faces challenges including variable terrain, steep slopes, and weak subgrade areas that may require extensive earthworks and stabilization. Adverse weather, particularly heavy rainfall, can delay surfacing operations and compromise pavement quality. Limited access to quality construction materials and transportation constraints may affect the project timeline and cost. Additionally, managing traffic flow, coordinating with utility services, and minimizing environmental and social impacts along the route are critical challenges for smooth execution.

Our Solution

Challenges can be mitigated by conducting thorough site and soil investigations, implementing soil stabilization where needed, and scheduling surfacing activities during favorable weather periods. Timely procurement and transportation of quality materials, along with traffic management plans, will reduce disruptions. Early coordination with utilities and strict environmental protection measures, such as erosion control and dust management, will ensure sustainable construction. Strong supervision, monitoring, and cost control are essential to complete the surfacing efficiently and within budget.

Key Features

Provides a long-lasting, smooth road surface for safe and efficient travel.

Prevents erosion, waterlogging, and road damage.

Ensures safe passage and minimal disruption during construction.

Controls dust, noise, and preserves surrounding ecosystems.

Related Projects

Black Topping of Martshala GC Road

Completed

Construction of Re-aligned National Highway

Completed

Pavement Strengthening works on Gelephu-Sarpang Road

Completed

Back to All Projects