Black topping of Kunecholing – Buyang road

Kunecholing - Buyang

Client

Trashiyangtse Dzongkhag

Completed

2022

Budget

82.15 M

Project Overview

The Challenge

The blacktopping of Kunecholing-Buyang Road faces challenges such as uneven terrain, weak subgrade, and sections requiring additional leveling and stabilization. Adverse weather, especially heavy rainfall, can delay paving and affect asphalt quality. Limited availability of construction materials, site accessibility issues, and logistical constraints may impact timelines and costs. Managing traffic during construction, coordinating with utilities, and minimizing environmental impacts are additional challenges that require careful planning.

Our Solution

Challenges can be mitigated by conducting thorough site preparation, soil stabilization, and proper leveling before paving. Scheduling paving works during favorable weather, timely procurement of quality materials, and efficient logistics will maintain progress. Traffic management plans, utility coordination, and environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision, monitoring, and cost control will ensure timely and quality completion.

Key Features

Provides a smooth and long-lasting road surface.

Prevents waterlogging and protects the road structure.

Ensures safe construction and minimal disruption.

Ensures safe construction and minimal disruption.

Related Projects

Blacktopping of Chazam – Doksum PNH (4.0km)

Completed

Blacktopping of Main Dzongkha Parking

Completed

Construction of KHEL Colony Road at Doksum, Trashiyangtse

Completed

Back to All Projects