Trashiyangtse
KHEL
2018
104.90 M
The KHEL Colony Road project at Doksum, Trashiyangtse, involves constructing a durable and well-drained road to enhance connectivity within the colony. The work includes site preparation, pavement construction, drainage installation, and utility coordination. Upon completion, the road will improve accessibility, support residential and operational activities, and contribute to local infrastructure development while ensuring environmental protection and adherence to safety standards.
The construction of the KHEL Colony Road at Doksum faces challenges such as uneven terrain, weak subgrade, and sections requiring proper leveling and compaction. Adverse weather, particularly heavy rainfall, may delay construction and affect pavement quality. Limited availability of construction materials, site accessibility, and logistical constraints may impact project timelines. Ensuring traffic management, coordination with utilities, and minimizing environmental impacts are additional challenges that need careful planning.
Challenges can be mitigated through proper site preparation, soil stabilization, and leveling before paving. Scheduling construction during favorable weather, timely procurement of quality materials, and efficient logistics will help maintain progress. Traffic and utility management plans, along with environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision, monitoring, and quality control will ensure timely and durable completion of the road.
Provides a smooth, long-lasting road surface for the colony.
Prevents waterlogging and protects the pavement structure.
Minimizes disruption during construction.
Implements dust, noise, and erosion control measures.