Chazam - Yangneer
DOR, Trashigang
2017
40.85 M
The Chazam–Yangneer GC Road blacktopping project involves upgrading the road surface to provide a durable, safe, and efficient route for vehicular traffic. The works include surface preparation, asphalt paving, drainage installation, and coordination with utilities. Upon completion, the upgraded road will enhance accessibility, reduce travel time, improve safety, and support local socio-economic development while ensuring environmental protection and adherence to safety standards.
The blacktopping of Chazam–Yangneer GC Road faces challenges such as uneven terrain, weak subgrade, and sections requiring additional leveling and compaction. Adverse weather, especially heavy rainfall, may delay paving and affect asphalt quality. Limited availability of construction materials, site accessibility, and logistical constraints can impact timelines and costs. Additionally, traffic management, utility coordination, and minimizing environmental impacts are key challenges that need careful planning.
Challenges can be mitigated by conducting proper site preparation, soil stabilization, and leveling prior to paving. Scheduling construction during favorable weather, timely procurement of quality materials, and efficient logistics will maintain project progress. Traffic and utility management plans, along with environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision, monitoring, and quality control will ensure timely and durable completion.
Provides a smooth, long-lasting road surface.
Prevents waterlogging and protects the road structure.
Ensures safe construction and minimal disruption.
Implements dust, noise, and erosion control measures.