Blacktopping of Chimung GC Road

Pemagatshel

Client

Pemagatshel Dzongkhag

Completed

2024

Budget

36.81 M

Project Overview

The Chimung GC Road blacktopping project aims to improve road conditions, enhance accessibility, and support local transportation needs. The project involves earthworks, asphalt paving, drainage installation, and utility coordination to ensure a smooth, durable roadway. By providing a high-quality, well-maintained road, the project will reduce travel time, facilitate safe movement, and promote socio-economic development in the area while ensuring minimal environmental impact.

The Challenge

The blacktopping of Chimung GC Road faces challenges including uneven terrain and variable subgrade conditions that may require additional earthworks and compaction. Adverse weather, particularly heavy rainfall, can delay paving operations and affect asphalt quality. Limited availability of quality construction materials and logistical constraints may impact timelines and costs. Additionally, traffic management, utility relocation, and minimizing environmental and social impacts are key challenges that need careful planning to ensure project efficiency and durability.

Our Solution

These challenges can be addressed by conducting proper soil investigations and site preparation, planning construction around favorable weather conditions, and ensuring timely procurement of quality materials. Effective traffic management, early coordination with utility providers, and strict environmental protection measures will reduce disruptions. Strong project supervision, monitoring, and cost control will help complete the road blacktopping works efficiently and within budget.

Key Features

Designed for longevity and resistance to heavy traffic.

Prevents water accumulation and maintains road integrity.

Ensures smooth construction and minimal disruption.

Controls dust, noise, and protects surrounding areas.

Related Projects

Improvement of Gangola-Lhuntse SNH Package II 12.86 km

Ongoing

Blacktopping of Duksum Kongcholing PNH along with Plum Concrete L-Drain & 1 no of 2m culvert

Completed

Construction of Linchen-Gangkhar Farm Road

Completed

Back to All Projects