Blacktopping of Duksum Kongcholing PNH along with Plum Concrete L-Drain & 1 no of 2m culvert

Duksum Kongcholing

Client

DoR, Trashigang

Completed

2021

Budget

48.78 M

Project Overview

The Duksum–Kongcholing PNH blacktopping project involves upgrading the road surface, constructing plum concrete L-drains, and installing a 2m culvert to improve drainage and accessibility. The work includes site preparation, asphalt paving, drainage installation, and utility coordination. Upon completion, the project will enhance road safety, reduce travel time, improve drainage, and support local transportation and socio-economic development while ensuring environmental protection and adherence to safety standards.

The Challenge

The blacktopping of Duksum–Kongcholing PNH faces challenges such as uneven terrain, weak subgrade, and sections requiring additional leveling and stabilization. Construction of L-drains and a 2m culvert adds complexity, requiring proper excavation, alignment, and structural stability. Adverse weather, especially heavy rainfall, may delay paving and drainage works. Limited availability of construction materials, logistical constraints, and coordination with utilities are additional challenges. Ensuring traffic management, environmental protection, and minimal disruption to the local community are also key concerns.

Our Solution

Challenges can be addressed through thorough site preparation, soil stabilization, and proper leveling before paving. Drainage and culvert works should be carefully planned and constructed with quality materials. Scheduling activities around favorable weather, timely procurement of materials, and efficient logistics will maintain progress. Traffic management plans, utility coordination, and environmental measures—such as dust, noise, and erosion control—will reduce disruptions. Regular supervision, monitoring, and quality control will ensure timely and durable project completion.

Key Features

Provides a smooth, long-lasting road surface.

Ensures effective drainage and prevents waterlogging.

Minimizes disruption during construction.

Implements dust, noise, and erosion control measures.

Related Projects

Blacktopping of Chimung GC Road

Completed

Construction of Pumping Water Supply under Zobel Geog. Pemagatshel

Completed

Improvement of Gangola-Lhuntse SNH Package II 12.86 km

Ongoing

Back to All Projects