New Doksum Town
Trashiyangste Dzongkhag
2021
24.42 M
The New Doskum Town Road blacktopping project aims to improve road surface quality, enhance accessibility, and provide a durable and safe route for residents and local traffic. The project includes surface preparation, asphalt paving, drainage installation, and coordination with utilities. Upon completion, the upgraded road will improve connectivity, reduce travel time, and support local development while ensuring environmental protection and adherence to safety standards.
The blacktopping of New Doskum Town Road faces challenges such as uneven road surface, weak subgrade, and sections requiring additional leveling and compaction. Adverse weather, particularly heavy rainfall, can delay paving operations and affect asphalt quality. Limited availability of quality construction materials and site accessibility issues may impact timelines and costs. Ensuring smooth traffic management, utility coordination, and minimizing environmental impacts are additional challenges that require careful planning.
Challenges can be mitigated by thorough site preparation, soil stabilization, and proper leveling prior to paving. Scheduling paving works around favorable weather conditions, timely procurement of quality materials, and efficient logistics will maintain project progress. Traffic management plans, utility coordination, and environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision, monitoring, and cost control will ensure timely and quality completion.
Provides a smooth and long-lasting road surface suitable for town traffic.
Prevents water accumulation and protects the pavement.
Ensures safe construction and minimal disruption.
Implements dust, noise, and erosion control measures.