Completed

Construction of various project roads in and around Power House area of Kholongchhu Hydro Energy Limited (KHEL), Trashiyangtse(Package 4)

Trashiyangtse

Client

KHEL

Completed

2017

Budget

76.10 M

Project Overview

The project involves constructing various roads in and around the Power House area of Kholongchhu Hydro Energy Limited (KHEL) to facilitate access, transportation, and operational efficiency. The works include earthworks, road construction, slope stabilization, drainage provision, and utility coordination. Upon completion, these roads will improve accessibility, support safe and efficient power plant operations, and contribute to the overall infrastructure development of the hydro project while maintaining environmental and safety standards.

The Challenge

The construction of project roads in and around the KHEL Power House area faces challenges such as steep slopes, rocky terrain, and weak subgrade that require extensive earthworks, stabilization, and retaining structures. Adverse weather, particularly heavy rainfall, can delay construction and affect road safety. Limited availability of construction materials, difficult site access, and logistical constraints may impact timelines. Coordination with utilities, traffic management within the operational project area, and minimizing environmental impacts are additional challenges that need careful planning.

Our Solution

Challenges can be mitigated through detailed site investigation, slope stabilization, and proper road alignment design. Construction activities should be scheduled around favorable weather, with timely procurement of quality materials and efficient logistics. Traffic management plans, utility coordination, and strict environmental protection measures—such as dust, noise, and erosion control—will minimize disruptions. Continuous supervision, monitoring, and quality control will ensure safe, durable, and timely completion of the project roads.

Key Features

Provides safe and long-lasting access within the power house area.

Ensures durability and prevents landslides.

Minimizes disruption to ongoing operations.

Implements dust, noise, and erosion control measures.

Related Projects

Improvement of Urban Water Supply Works for Trashigang Town

Completed

Black Topping of Tang GC Road

Completed

Construction of additional Exit Road toward south for Ngaglam Dry Port

Completed

Back to All Projects