Construction of Re-aligned National Highway

Client

PHPA-1. LOBESA

Completed

2011

Budget

28.54 M

Project Overview

The re-aligned national highway project involves constructing a new alignment to improve road safety, traffic flow, and connectivity. The works include earthworks, pavement construction, slope stabilization, retaining structures, drainage, and utility coordination. Upon completion, the upgraded highway will enhance regional connectivity, reduce travel time, improve safety, and support socio-economic development while adhering to environmental and safety standards.

The Challenge

The construction of the re-aligned national highway faces challenges such as uneven and steep terrain, weak subgrade, and sections prone to landslides or soil erosion, requiring extensive earthworks, retaining structures, and slope stabilization. Adverse weather, particularly heavy rainfall, can delay construction and affect pavement quality. Limited access to construction materials, logistical constraints, and coordination with utilities may impact timelines. Ensuring traffic management, worker safety, and minimizing environmental and social impacts are additional challenges.

Our Solution

Challenges can be mitigated through detailed site investigation, proper road alignment design, and slope stabilization measures. Construction scheduling during favorable weather, timely procurement of quality materials, and efficient logistics will maintain progress. Traffic management, utility coordination, and strict environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision, monitoring, and quality control will ensure safe, durable, and timely completion of the re-aligned highway.

Key Features

Provides a safe and long-lasting highway surface.

Ensures safety and durability in challenging terrain.

Minimizes disruption during construction.

Implements dust, noise, and erosion control measures.

Related Projects

Pavement Strengthening works on Gelephu-Sarpang Road

Completed

Construction KHEL Colony at New Doskum, Trashiyangtse

Completed

Widening of Duksum Buyang SNH (ch. 5.70-8.00 = 2.3km)

Completed

Back to All Projects