New Doskum, Trashiyangtse
Kholongchhu Hydro Energy Ltd.,
2022
170.70 M
The KHEL Colony project at New Doskum, Trashiyangtse, involves constructing residential and support facilities to provide safe and durable housing for staff and their families. The work includes site preparation, foundation and structural construction, utility installation, and environmental management. Upon completion, the colony will enhance living conditions, support staff welfare, and contribute to sustainable community development in the area.
The construction of KHEL (Khadi and Handicrafts Extension / Staff Housing) Colony at New Doskum faces challenges such as uneven terrain, rocky or soft soil conditions requiring leveling and proper foundation design. Adverse weather, especially during the monsoon season, can delay construction activities and affect material quality. Limited access to construction materials, transportation challenges, and coordination of utilities (water, electricity, sewage) may affect project timelines. Ensuring safety, environmental protection, and minimal disruption to nearby communities are also key challenges.
Challenges can be mitigated by conducting detailed site surveys, soil stabilization, and proper foundation design. Scheduling construction around favorable weather, timely procurement of materials, and efficient logistics will help maintain progress. Coordination for utility connections and traffic management, along with strict environmental and safety measures—such as dust, noise, and erosion control—will minimize disruptions. Regular supervision and monitoring will ensure quality and timely completion of the colony.
Comfortable and safe housing for staff and associated facilities.
Foundations and structures designed for stability and longevity.
Proper coordination of water, electricity, sewage, and road access.
Implements erosion control, dust, and noise mitigation measures.