Duksum Buyang
DoR, Trashigang
2020
14.13 M
The Duksum–Buyang SNH widening project covers a 2.3 km stretch aimed at improving road width, safety, and traffic flow. The work includes earthworks, pavement construction, slope stabilization, and utility coordination. Upon completion, the upgraded road will enhance connectivity, support local transportation needs, and ensure safer travel while maintaining environmental and safety standards.
The widening of the Duksum–Buyang SNH road faces challenges such as steep slopes, uneven terrain, and weak subgrade that may require extensive earthworks, retaining structures, and slope stabilization. Adverse weather, particularly heavy rainfall, can delay construction and compromise road safety. Limited access to construction materials, logistical constraints, and traffic management along the operational road are additional challenges. Coordination with utilities and minimizing environmental and social impacts are also critical for smooth execution.
Challenges can be addressed through detailed site investigation, soil stabilization, and slope protection measures. Construction scheduling around favorable weather, timely procurement of quality materials, and efficient logistics will help maintain progress. Traffic management plans, utility coordination, and environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision and monitoring will ensure quality, safety, and timely completion of the widening works.
Enhances safety and traffic capacity.
Ensures durability and slope protection.
Minimizes disruption during construction.
Implements dust, noise, and erosion control measures.