Completed

Construction of Linchen-Gangkhar Farm Road

Linchen-Gangkhar

Client

Linchen-Gangkhar

Completed

2012

Budget

26.63

Project Overview

The Linchen–Gangkhar Farm Road project involves constructing a road to improve connectivity, accessibility, and transport efficiency for farm areas. The works include site preparation, pavement construction, drainage installation, and coordination with utilities. Upon completion, the road will enhance access to agricultural areas, reduce travel time, improve safety, and support socio-economic development while maintaining environmental and safety standards.

The Challenge

The construction of Linchen–Gangkhar Farm Road faces challenges such as uneven terrain, weak subgrade, and sections requiring leveling and stabilization. Adverse weather, especially heavy rainfall, can delay construction and affect the quality of pavement and earthworks. Limited access to construction materials, logistical constraints, and coordination with utilities may impact timelines. Traffic management, ensuring safety, and minimizing environmental impacts are also key challenges to consider.

Our Solution

Challenges can be mitigated through proper site preparation, soil stabilization, and leveling prior to pavement construction. Scheduling construction during favorable weather, timely procurement of quality materials, and efficient logistics will maintain project progress. Traffic and utility management plans, along with environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision, monitoring, and quality control will ensure timely and durable completion.

Key Features

Provides a smooth and long-lasting road surface.

Prevents waterlogging and protects the pavement.

Minimizes disruption during construction.

Implements dust, noise, and erosion control measures.

Related Projects

Site development work for the Development of Dry Port ion Nganglam

Completed

Blacktopping of Duksum Kongcholing PNH along with Plum Concrete L-Drain & 1 no of 2m culvert

Completed

Construction of RRM Walls and Railings at Khitshang and site developmentworks at Buyang (Infra 2021/2)

Completed

Back to All Projects