Construction of additional Exit Road toward south for Ngaglam Dry Port

Ngaglam

Client

Ministry of Industry, Commerce and Employment

Completed

2023

Budget

4.57 M

Project Overview

The construction of an additional exit road toward the south for Nganglam Dry Port aims to improve traffic flow, operational efficiency, and connectivity for heavy vehicles. The project includes earthworks, pavement construction, drainage installation, and utility coordination to ensure a safe, durable, and efficient road. This new exit will enhance port operations, reduce congestion, and support regional trade and logistics development while ensuring environmental protection and minimal disruption to the surrounding community.

The Challenge

The construction of an additional exit road for Nganglam Dry Port faces challenges such as uneven terrain, weak subgrade, and potential slope stability issues that may require extensive earthworks and soil stabilization. Adverse weather conditions, particularly heavy rainfall, can delay construction and affect pavement quality. Land acquisition, utility relocation, and coordination with stakeholders may cause further delays. Limited access to construction materials, traffic management during construction, and minimizing environmental impacts are also significant challenges that need careful planning.

Our Solution

Challenges can be addressed through proper site investigation and soil stabilization measures, planning construction activities around favorable weather, and timely procurement of quality materials. Early coordination with stakeholders for land and utility relocation, traffic management plans, and environmental protection measures such as erosion and dust control will reduce disruptions. Strong supervision, monitoring, and cost control will ensure efficient and timely completion of the exit road.

Key Features

Ensures long-lasting road performance for heavy vehicle traffic.

Prevents waterlogging and protects the road structure.

Minimizes disruption to port operations and surrounding areas.

Implements dust, noise, and erosion control measures.

Related Projects

Improvement of Gangola-Lhuntse SNH Package II 12.86 km

Ongoing

Construction of Hostel at Yongphula College, Trashigang

Completed

Surfacing of Road – Khothakpa-Tshobaley between 61.546 km to 76.500

Completed

Back to All Projects