Completed

Construction of Access Road to Audit- 3 & 4 (Package-III)

Trongsa

Client

MHPA, Trongsa

Completed

2012

Budget

107.20 M

Project Overview

The access road construction to Audit-3 & 4 (Package-III) involves developing a safe and durable route to improve connectivity and access within the area. The works include site preparation, pavement construction, drainage installation, and utility coordination. Upon completion, the access road will enhance accessibility, reduce travel time, improve safety, and support operational efficiency while adhering to environmental and safety standards.

The Challenge

The construction of the access road to Audit-3 & 4 faces challenges such as uneven terrain, weak subgrade, and sections requiring proper leveling and stabilization. Adverse weather, especially heavy rainfall, can delay construction and affect road quality. Limited access to construction materials, logistical constraints, and coordination with existing utilities may impact timelines. Ensuring traffic management, safety for construction workers, and minimizing environmental impacts are additional challenges.

Our Solution

Challenges can be mitigated through thorough site preparation, soil stabilization, and proper leveling before paving. Scheduling construction during favorable weather, timely procurement of quality materials, and efficient logistics will maintain project progress. Traffic and utility management plans, along with environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision, monitoring, and quality control will ensure timely and durable completion.

Key Features

Provides a smooth and long-lasting access route.

Prevents waterlogging and protects the pavement.

Minimizes disruption during construction.

Implements dust, noise, and erosion control measures.

Related Projects

Construction KHEL Colony at New Doskum, Trashiyangtse

Completed

Construction of Gomphu-Panbang Road SH

Completed

Construction of Ramjar-Phuyang farm Road under Ramjar Geog

Completed

Back to All Projects