Completed

Site development work for the Development of Dry Port ion Nganglam

Nganglam

Client

Ministry of Industry, Commerce and Employment

Completed

2023

Budget

107.30 M

Project Overview

The site development for the Nganglam Dry Port involves preparing a fully leveled and stable area to support the construction of port infrastructure. The work includes earthworks, drainage installation, utility coordination, and environmental management to ensure a safe and durable operational site. The project will enhance trade efficiency, improve logistics, and support economic development in the region, while adhering to environmental and safety standards.

The Challenge

The site development work for the Nganglam Dry Port faces challenges such as uneven terrain, variable soil conditions, and the need for extensive earthworks and leveling. Adverse weather, especially heavy rainfall, may delay site preparation and affect construction quality. Coordination with multiple stakeholders for land acquisition, utility relocation, and environmental approvals can cause delays. Limited availability of construction materials, logistical constraints, and ensuring minimal disruption to surrounding communities and traffic are additional challenges that need careful planning.

Our Solution

These challenges can be mitigated through thorough site investigation and soil stabilization measures, planning construction around favorable weather, and timely procurement of materials. Early coordination with stakeholders for land, utilities, and environmental clearances will minimize delays. Proper drainage, traffic management, and environmental protection measures will ensure sustainable development. Strong project supervision, monitoring, and cost control will help complete the site development efficiently and within budget.

Key Features

Ensures safe, durable foundation for the Dry Port infrastructure.

Prevents waterlogging and maintains operational efficiency.

Minimizes disruption to ongoing activities and nearby communities.

Implements erosion, dust, and noise control measures.

Related Projects

Surfacing of Road – Khothakpa-Tshobaley between 61.546 km to 76.500

Completed

Construction of RRM Walls and Railings at Khitshang and site developmentworks at Buyang (Infra 2021/2)

Completed

Construction of Realigned National Highway Bifurcating

Completed

Back to All Projects