Construction of Pumping Water Supply under Zobel Geog. Pemagatshel

Pemagatshel

Client

Pemagatshel Dzongkhag

Completed

2015

Budget

28.98 M

Project Overview

The project aims to provide a safe and reliable water supply to Zobel Geog., Pemagatshel through a pumping system that ensures efficient water distribution. The works include site preparation, pipeline and pump installation, storage and distribution structures, and environmental management. Upon completion, the project will enhance access to potable water, improve public health, and support socio-economic development while maintaining environmental standards and safety.

The Challenge

The construction of the pumping water supply system under Zobel Geog., Pemagatshel faces challenges such as uneven terrain, variable soil conditions, and the need for proper foundation and pipeline support. Adverse weather, especially heavy rainfall, can delay construction and affect equipment and pipeline installation. Limited access to construction materials, logistical constraints, and coordination with existing utilities may impact project timelines. Ensuring water quality, environmental protection, and safety during construction are additional key challenges.

Our Solution

Challenges can be mitigated by conducting detailed site surveys, proper foundation and pipeline design, and careful alignment of the pumping system. Construction activities should be scheduled around favorable weather conditions, with timely procurement of quality materials and efficient logistics. Coordination with utility providers, implementation of water safety measures, and environmental protection measures—such as erosion control and sediment management—will minimize negative impacts. Continuous supervision and monitoring will ensure timely and quality completion.

Key Features

Provides reliable and sustainable water distribution to the community.

Ensures long-term performance and safety.

Smooth integration with existing water supply infrastructure.

Implements dust, noise, and erosion control measures.

Related Projects

Double lanning of Northern East-West Highway from Pangser to Kilikhar (ch. 78.89-84.89 = 6.00km)

Completed

Site development work for the Development of Dry Port ion Nganglam

Completed

Nganglam-Deothang Road material supply

Ongoing

Back to All Projects