Completed

Construction of Staff quarters, landscaping & site development works at Sherubtse College.

Sherubtse College

Client

RUB

Completed

2020

Budget

47.33 M

Project Overview

The project involves constructing staff quarters along with landscaping and site development works at Sherubtse College to provide safe, durable, and comfortable living facilities for staff. The work includes site preparation, foundation and structural construction, utility installation, landscaping, and drainage works. Upon completion, the project will enhance staff welfare, improve campus aesthetics, and support sustainable development while maintaining safety and environmental standards.

The Challenge

The construction of staff quarters and site development works at Sherubtse College faces challenges such as uneven terrain, variable soil conditions, and the need for proper site leveling and foundation stabilization. Adverse weather, particularly heavy rainfall, may delay construction activities and affect material quality. Limited access to construction materials, logistical constraints, and coordination for utilities (water, electricity, sewage) could impact timelines. Additionally, ensuring safety, environmental protection, and minimal disruption to college operations are key challenges.

Our Solution

Challenges can be mitigated by conducting detailed site surveys, soil stabilization, and proper foundation design. Construction activities should be scheduled around favorable weather, with timely procurement of quality materials and efficient logistics. Coordination for utility connections, traffic management within the campus, and strict environmental measures—such as dust, noise, and erosion control—will minimize disruptions. Continuous supervision and monitoring will ensure quality construction and timely completion.

Key Features

Provides safe, comfortable, and functional housing for college staff.

Includes leveling, drainage, walkways, and green spaces.

Ensures proper water, electricity, and sewage connections.

Implements dust, noise, and erosion control measures.