Tang
DOR, Trongsa
2016
31.12 M
The Tang GC Road blacktopping project involves upgrading the road surface to provide a safe, durable, and efficient route for vehicular traffic. The works include surface preparation, asphalt paving, drainage installation, and utility coordination. Upon completion, the upgraded road will improve accessibility, reduce travel time, enhance safety, and support local socio-economic development while maintaining environmental and safety standards.
The blacktopping of Tang GC Road faces challenges such as uneven terrain, weak subgrade, and sections requiring additional leveling and stabilization. Adverse weather, particularly heavy rainfall, may delay paving and affect asphalt quality. Limited access to quality construction materials, site accessibility, and logistical constraints could impact timelines and costs. Managing traffic, coordinating with utilities, and minimizing environmental impacts are additional challenges that require careful planning.
Challenges can be mitigated by thorough site preparation, soil stabilization, and proper leveling before paving. Scheduling construction during favorable weather, timely procurement of quality materials, and efficient logistics will help maintain progress. Traffic management, utility coordination, and environmental protection measures—such as dust, noise, and erosion control—will reduce disruptions. Continuous supervision, monitoring, and quality control will ensure timely and durable completion.
Provides a smooth and long-lasting road surface.
Prevents waterlogging and protects the pavement.
Ensures safe construction and minimal disruption.
Implements dust, noise, and erosion control measures.