Completed

Construction of RRM Walls and Railings at Khitshang and site developmentworks at Buyang (Infra 2021/2)

Khitshang

Client

Kholongchhu Hydro Energy Ltd.,

Completed

2022

Budget

22.51 M

Project Overview

The project involves the construction of RRM walls and safety railings at Khitshang to stabilize slopes and protect infrastructure, along with site development works at Buyang to prepare land for future development. The works include earthworks, wall construction, drainage installation, and utility coordination, ensuring safe, durable, and functional infrastructure. Upon completion, the project will enhance road safety, improve site usability, and support long-term regional development while adhering to environmental and safety standards.

The Challenge

The construction of RRM (Reinforced Retaining Masonry) walls and railings at Khitshang, along with site development works at Buyang, faces challenges such as uneven terrain, slope instability, and variable soil conditions that require careful design and stabilization. Adverse weather, especially heavy rainfall, can cause delays and affect structural quality. Limited access to quality construction materials, logistical constraints, and coordination with existing utilities may impact timelines. Ensuring environmental protection, safety of workers, and minimizing disruption to local communities are additional challenges that need careful management.

Our Solution

Challenges can be mitigated through detailed site investigation, soil stabilization, and engineering design of RRM walls and railings. Construction activities should be scheduled around favorable weather, with proper drainage systems to prevent water accumulation. Early coordination for utility relocation, timely procurement of quality materials, and traffic/site management plans will reduce disruptions. Environmental measures, including erosion control, dust and noise management, and safe work practices, should be implemented throughout the project. Regular supervision and monitoring will ensure quality and timely completion.

Key Features

Provides slope stabilization and safety along road sections.

Includes leveling, drainage, and preparation for future infrastructure.

Ensures smooth construction with minimal disruption.

Implements erosion control, dust, and noise mitigation

Related Projects

Construction of Re-aligned National Highway

Completed

Construction of KHEL Colony Road at Doksum, Trashiyangtse

Completed

Construction of various project roads in and around Power House area of Kholongchhu Hydro Energy Limited (KHEL), Trashiyangtse(Package 4)

Completed

Back to All Projects