Completed

Improvement of Urban Water Supply Works for Trashigang Town

Trashigang

Client

Trashigang Dzongkhag

Completed

2020

Budget

45.33 M

Project Overview

The project aims to improve the urban water supply system of Trashigang Town by upgrading pipelines, storage facilities, and related infrastructure to provide safe and reliable water to residents. The work includes pipeline installation, reservoir improvements, site works, and environmental management. Upon completion, the project will enhance water supply reliability, support public health, and contribute to sustainable urban development while adhering to environmental and safety standards.

The Challenge

The improvement of urban water supply works for Trashigang Town faces challenges such as aging pipelines, inadequate storage facilities, and variable terrain that may complicate pipeline installation. Adverse weather, particularly heavy rainfall, can disrupt construction and affect water infrastructure works. Limited access to quality construction materials, logistical constraints, and coordination with existing utilities may impact project timelines. Ensuring water quality, minimizing environmental impacts, and maintaining service to residents during construction are additional key challenges.

Our Solution

Challenges can be mitigated through detailed site surveys, proper planning for pipeline replacement and storage upgrades, and scheduling construction during favorable weather. Timely procurement of quality materials, efficient logistics, and coordination with utility providers will maintain progress. Measures to protect water quality, along with environmental management—such as erosion control and sediment management—will minimize negative impacts. Regular supervision, monitoring, and adherence to safety standards will ensure timely and quality completion.

Key Features

Ensures reliable and sustainable water distribution to the town.

Enhances system capacity and durability.

Ensures smooth integration with existing infrastructure.

Implements dust, noise, and erosion control measures.

Related Projects

Black Topping of Martshala GC Road

Completed

Upgradation & Blacktopping of Khorlochu HPL Permanent Colony Roads at Doksum, Trashiyangtse

Ongoing

Blacktopping of Main Dzongkha Parking

Completed