Project Overview

The project involves constructing a bypass road along Paro International Airport to improve traffic flow and accessibility while ensuring safety and minimal disruption to airport operations. The works include earthworks, pavement construction, drainage installation, and coordination with utilities and airport authorities. Upon completion, the bypass will enhance regional connectivity, reduce congestion near the airport, improve safety, and support socio-economic development while adhering to environmental and safety standards.

The Challenge

The construction of the bypass road along Paro International Airport faces challenges such as uneven terrain, weak subgrade, and areas requiring proper leveling and compaction. Proximity to the airport requires careful planning to avoid disruption to airport operations, security, and traffic. Adverse weather, particularly heavy rainfall, can delay construction and affect pavement quality. Limited access to construction materials, logistical constraints, and coordination with utilities are additional challenges. Environmental protection and safety considerations are also critical due to the sensitive location.

Our Solution

Challenges can be mitigated through proper site surveys, soil stabilization, and careful alignment design to avoid interference with airport operations. Scheduling construction during favorable weather, timely procurement of quality materials, and efficient logistics will maintain progress. Coordination with airport authorities, utility management, traffic control, and strict environmental protection measures—such as dust, noise, and erosion control—will minimize disruptions. Continuous supervision and monitoring will ensure safe and timely project completion.

Key Features

Provides a smooth and long-lasting bypass road surface.

Ensures minimal disruption to airport operations and security.

Smooth execution of construction activities without affecting airport operations.

Implements dust, noise, and erosion control measures.

Related Projects

Upgradation & Blacktopping of Khorlochu HPL Permanent Colony Roads at Doksum, Trashiyangtse

Ongoing

Black topping of New Doksum Town road

Completed

Improvement of Urban Water Supply Works for Trashigang Town

Completed

Back to All Projects