Completed

Construction of Ramjar-Phuyang farm Road under Ramjar Geog

Ramjar-Phuyang

Client

RGoB. Tashiyangtse

Completed

2011

Budget

19.73 M

Project Overview

The Ramjar–Phuyang Farm Road project involves constructing a road to improve connectivity and accessibility for farm areas under Ramjar Geog. The works include site preparation, pavement construction, drainage installation, and coordination with utilities. Upon completion, the road will enhance transport efficiency, reduce travel time, improve safety, and support socio-economic and agricultural development while maintaining environmental and safety standards.

The Challenge

The construction of the Ramjar–Phuyang Farm Road faces challenges such as uneven terrain, weak subgrade, and areas requiring proper leveling and stabilization. Adverse weather, especially heavy rainfall, can delay construction and affect pavement quality. Limited access to construction materials, site accessibility issues, and logistical constraints may impact timelines. Traffic management, utility coordination, and minimizing environmental impacts are additional challenges.

Our Solution

Challenges can be mitigated through thorough site preparation, soil stabilization, and leveling before pavement construction. Construction should be scheduled during favorable weather, with timely procurement of quality materials and efficient logistics. Traffic and utility management, along with environmental protection measures—such as dust, noise, and erosion control—will minimize disruptions. Continuous supervision, monitoring, and quality control will ensure timely and durable completion of the road.

Key Features

Provides a smooth and long-lasting road for farm transport.

Protects the road from waterlogging and erosion.

Ensures safe and smooth construction.

Implements dust, noise, and erosion control measures.

Related Projects

Construction of Primary Road access at Motanga Industrial Park

Completed

Improvement of Tshelingore-Khothakpa SNH (Ch.21+000-Ch. 32+100), Package III

Completed

Widening of Duksum Buyang SNH (ch. 5.70-8.00 = 2.3km)

Completed

Back to All Projects