Project Overview

The Ranjung Water Supply Project aims to provide a safe, reliable, and sustainable water supply to the local community. The project includes pipeline installation, construction of reservoirs and storage facilities, and associated site works to ensure efficient water distribution. Upon completion, the project will improve access to potable water, support public health, and contribute to the socio-economic development of the area while maintaining environmental standards and safety.

The Challenge

The Ranjung Water Supply Project faces challenges such as difficult terrain and variable soil conditions for pipeline laying and reservoir construction. Adverse weather, particularly heavy rainfall, can disrupt construction activities and affect water infrastructure works. Limited access to construction materials, logistical constraints, and coordination with existing utilities may impact project timelines. Ensuring water quality, minimizing environmental impacts, and maintaining safety during construction are additional challenges that require careful management.

Our Solution

Challenges can be mitigated through detailed site surveys, proper trenching, and soil stabilization for pipelines and structures. Scheduling construction during favorable weather, timely procurement of quality materials, and efficient logistics will help maintain progress. Coordination with utility services, implementation of water safety measures, and strict environmental protection measures—such as erosion control and sediment management—will minimize disruptions. Regular supervision and monitoring will ensure timely and quality completion of the project.

Key Features

Ensures sustainable water distribution to the community.

Designed for long-term performance and safety.

Smooth integration with existing infrastructure.

Implements erosion control, sediment management, and minimal ecological disturbance.

Related Projects

Construction of various project roads in and around Power House area of Kholongchhu Hydro Energy Limited (KHEL), Trashiyangtse(Package 4)

Completed

Construction of Bypass Road along Paro International Air port

Completed

Construction of R/E civil works at Pemagatshel

Completed

Back to All Projects