Construction of Primary Road access at Motanga Industrial Park

Motanga Industrial Park

Client

RCC/19 BRTF of Project Dantak. East Bhutan

Completed

2024

Budget

48 M

Project Overview

The Primary Road Access project at Motanga Industrial Park involves the construction of a durable, well-planned road to improve connectivity and facilitate industrial development in the area. The project includes earthworks, pavement construction, drainage installation, and utility coordination to ensure safe and efficient transportation. Designed to handle heavy industrial traffic, the road will enhance accessibility, reduce travel time, and support the growth of businesses within the industrial park. Environmental protection and stakeholder coordination are integral to the project, ensuring sustainable development and minimal disruption to the surrounding community.

The Challenge

The construction of the primary road access at Motanga Industrial Park faces challenges such as difficult terrain and soil conditions, adverse weather, land acquisition delays, drainage issues, limited material availability, high transportation costs, utility relocation, traffic management, environmental impacts, and coordination among stakeholders, all of which can affect the project’s cost, schedule, and overall performance.

Our Solution

The challenges can be mitigated by conducting proper site and soil investigations, planning construction activities around weather conditions, and ensuring early land acquisition and utility coordination. Effective drainage design, timely procurement of quality materials, and efficient traffic management will reduce construction disruptions. Environmental protection measures, along with strong project coordination and cost control, are essential to complete the road access works on time and within budget.

Key Features

Engineered to withstand heavy industrial traffic and variable soil conditions.

Properly designed to prevent water logging and ensure long-term road performance.

Ensures safe construction operations while accommodating existing utilities and local traffic.

Minimizes ecological impact through dust, noise, and erosion control measures.

Related Projects

Black topping of Kunecholing – Buyang road

Completed

Blacktopping of Main Dzongkha Parking

Completed

Construction of additional Exit Road toward south for Ngaglam Dry Port

Completed

Back to All Projects