DGPC
220 M
The project involves constructing access roads and bridges for DorjiLung Hydropower Project (Package I & II) to facilitate transportation of materials, equipment, and personnel to the hydropower site. The works include earthworks, pavement construction, bridge structures, slope stabilization, drainage, and utility coordination. Upon completion, the roads and bridges will improve site accessibility, enhance operational efficiency, ensure safety, and support socio-economic development while maintaining environmental and safety standards.
The construction of access roads and bridges for DorjiLung Hydropower Project (Package I & II) faces challenges such as steep and uneven terrain, weak subgrade, and river crossings requiring bridge structures. Adverse weather, particularly heavy rainfall, may cause landslides, flooding, and delays in construction. Limited access to construction materials, difficult site logistics, and coordination with utilities can impact timelines. Ensuring safety of workers, traffic management during construction, and minimizing environmental impacts are critical challenges.
Challenges can be mitigated through detailed site investigations, proper road alignment and bridge design, and slope stabilization measures. Scheduling construction during favorable weather, timely procurement of quality materials, and efficient logistics will help maintain progress. Traffic and utility management, environmental protection measures—including dust, noise, erosion control, and sediment management—will minimize disruptions. Continuous supervision, monitoring, and quality assurance will ensure safe, durable, and timely completion of roads and bridges.
Provides safe and long-lasting access to the hydropower project sites.
Ensures reliable river crossings and uninterrupted connectivity.
Minimizes disruption to ongoing operations and local communities.
Implements dust, noise, erosion, and sediment control measures.